Using Photothermal Power Generation to Improve the New Energy Consumption Rate of High Proportion of New Energy Systems

FU Xu,ZHANG Yujin

Distributed Energy ›› 2022, Vol. 7 ›› Issue (4) : 37-41.

PDF(935 KB)
PDF(935 KB)
Distributed Energy ›› 2022, Vol. 7 ›› Issue (4) : 37-41. DOI: 10.16513/j.2096-2185.DE.2207405
Basic Research

Using Photothermal Power Generation to Improve the New Energy Consumption Rate of High Proportion of New Energy Systems

Author information +
History +

HeighLight

Concentrating solar power generation has the characteristics of clean, good regulation performance, equipped with energy storage system, etc., which can improve the capacity of the system to accept new energy generation by self-regulating peak. Provincial power grid in northwest area as the research object, analyses the photo-thermal power generation to increase the use of new energy given, photo-thermal power generation in new energy is studied under the condition of invariable abandoned electric rate, improve the feasibility of new energy given accounted, used in the calculation of production simulation based on mathematical optimization programs, in weeks for scale, calculate the year 8 760 h of system running status, It takes into account the starting and stopping of units, inter-day regulation of hydropower, inter-day regulation of pumping and storage, inter-day regulation of photothermal power stations and other factors. The research results can provide reference for the development of high proportion new energy system.

Cite this article

Download Citations
Xu FU , Yujin ZHANG. Using Photothermal Power Generation to Improve the New Energy Consumption Rate of High Proportion of New Energy Systems[J]. Distributed Energy Resources. 2022, 7(4): 37-41 https://doi.org/10.16513/j.2096-2185.DE.2207405

References

[1]
尔顺重庆,等. 太阳能光热发电并网运行及优化规划研究综述与展望[J]. 中国电机工程学报2016, 36(21): 5765-5775, 6019.
DU Ershun, ZHANG Ning, KANG Chongqing, et al. Reviews and prospects of the operation and planning optimization for grid integrated concentrating solar power[J]. Proceedings of the CSEE, 2016, 36(21): 5765-5775, 6019.
[2]
富春攀峰. 青海电网规模化储能电站需求和效益研究[J]. 油气与新能源2021, 33(4): 43-47.
FU Xu, LI Fuchun, YANG Panfeng. Study on demand and benefit of large-scale energy storage power station in Qinghai power grid[J]. Petroleum and New Energy, 2021, 33(4): 43-47.
[3]
重庆治坪,等. 基于序列运算的风电可信容量计算方法[J]. 中国电机工程学报2011, 31(25): 1-9.
ZHANG Ning, KANG Chongqing, CHEN Zhiping, et al. Wind power credible capacity evaluation model based on sequence operation[J]. Proceedings of the CSEE, 2011, 31(25): 1-9.
[4]
. 太阳能光热与热电耦合发电技术综述(下)[J]. 节能与环保2014(3): 50-53.
[5]
International Energy Agency (IEA). Technology roadmap: Concen-trating solar power[R/OL].
[6]
开贵,等. 考虑光伏出力与负荷相关性的光伏电站容量可信度评估[J]. 电力系统保护与控制2013, 41(14): 1-6.
GAO Ying, XIE Kaigui, HU Bo, et al. Photovoltaic power capacity credit evaluation model considering the correlation between photovoltaic power generation and system load[J]. Power System Protection and Control, 2013, 41(14): 1-6.
[7]
东霞,等. 并网光伏电站置信容量评估[J]. 电网技术2012, 36(9): 31-35.
FANG Xin, GUO Qiang, ZHANG Dongxia, et al. Capacity credit evaluation of grid-connected photovoltaic generation[J]. Power System Technology, 2012, 36(9): 31-35.
[8]
CHEN R, SUN H, GUO Q, et al. Reducing generation uncertainty by integrating CSP with wind power: An adaptive robust optimization-based analysis[J]. IEEE Transactions on Sustainable Energy, 2015(2): 583-594.
[9]
XU Ti, ZHANG Ning. Coordinated operation of concentrated solar power and wind resources for the provision of energy and reserve services[J]. IEEE Transactions on Power Systems, 2017, 32(2): 1260-1271.
[10]
MADAENI S H. Estimating the capacity value of concentrating solar power plants: A case study of the southwestern united states[J]. IEEE Transactions on Power Systems, 2012, 27(2): 1116-1124.
[11]
文涛相俊,等. 规模化储能电站电池一致性的统计特性研究[J]. 发电技术2021, 42(3): 298-305.
JIN Wentao, LI Xiangjun, HUI Dong, et al. Study on statistical characteristics of battery consistency in large-scale energy storage power stations[J]. Power Generation Technology, 2021, 42(3): 298-305.
[12]
宏杨宏斌庆来,等. 含大规模储热的光热电站-风电联合系统多日自调度方法[J]. 电力系统自动化2016, 40(11): 17-23.
JIN Hongyang, SUN Hongbin, GUO Qinglai, et al. Multi-day self-scheduling method for combined system of CSP plants and wind power with large-scale thermal energy storage contained[J]. Automation of Electric Power Systems, 2016, 40(11): 17-23.
[13]
富春,等. 含有电加热装置的光热机组运行策略研究[J]. 智慧电力2018, 46(3): 38-43.
SUN Pei, FU Xu, LI Fuchun, et al. Study on operation strategy of concentrating solar power plant with electric heating device[J]. Smart Power, 2018, 46(3): 38-43.
[14]
昱卓杭飞. 基于特征算法的塔式光热电站镜场云识别技术研究[J]. 智慧电力2021, 49(11): 38-44.
XIE Yuzhuo, LI Gang, NI Hangfei. Cloud recognition in heliostat field of tower concentrating solar power station based on feature algorithm[J]. Smart Power, 2021, 49(11): 38-44.
[15]
雨津富春,等. 新疆电网光热发电效益评估[J]. 油气与新能源2021, 33(5): 39-43.
FU Xu, ZHANG Yujin, LI Fuchun, et al. Evaluation of the benefit of CSP in xinjiang power grid[J]. Petroleum and New Energy, 2021, 33(5): 39-43.
[16]
,等. 光热电站容量效益评估及影响因素研究[J]. 电力工程技术2021, 40(3): 186-192.
FU Xu, YANG Xin, WANG Ying, et al. The capacity benefit evaluation of CSP power station and its influencing factors[J]. Electric Power Engineering Technology, 2021, 40(3): 186-192.
PDF(935 KB)

Accesses

Citation

Detail

Sections
Recommended

/