Upgrading Scheme and Practice of Liannan Microgrid With Photovoltaic and Energy Storage

CHEN Songbo,LUO Weibin,LIANG Tangjie

Distributed Energy ›› 2018, Vol. 3 ›› Issue (6) : 67-73.

PDF(1467 KB)
PDF(1467 KB)
Distributed Energy ›› 2018, Vol. 3 ›› Issue (6) : 67-73. DOI: 10.16513/j.cnki.10-1427/tk.2018.06.010
Optimization Planning of Active Distribution Network

Upgrading Scheme and Practice of Liannan Microgrid With Photovoltaic and Energy Storage

Author information +
History +

Abstract

In view of the problems of long line, low terminal voltage and poor reliability in remote mountainous areas, an effective way is to make full use of local renewable energy and build microgrid. In this paper, the existing problems of Liannan power grid and pilot line are analyzed, and the reconstruction scheme of microgrid with photovoltaic and energy storage is proposed. In the process of practice, the ‘three-phase unbalance governance’,the ‘accurate fault location of overhead line’,and the ‘intelligent inspection of power channel and power equipment’,are further adopted to improve power supply quality. The investment estimation and effect analysis of the proposed scheme are carried out. The results show that the proposed scheme can significantly improve the power quality and supply reliability, and deal with the disordered access of distributed generation, which has the value of popularization and application.

Key words

microgrid / photovoltaic power generation / stored energy / reconstruction scheme / power supply quality

Cite this article

Download Citations
Songbo CHEN , Weibin LUO , Tangjie LIANG. Upgrading Scheme and Practice of Liannan Microgrid With Photovoltaic and Energy Storage[J]. Distributed Energy Resources. 2018, 3(6): 67-73 https://doi.org/10.16513/j.cnki.10-1427/tk.2018.06.010

References

[1]
HUANG Cunqiang, AN Juan, HE Yong, et al. Research on the typical electric power supply mode in the electric power distribution networks for countries, townships and villages in Qinghai[J]. Qinghai Electric Power, 2016, 35(2): 41-44.
黄存强,安娟,贺永,等. 青海县乡村配电网典型供电模式研究[J]. 青海电力2016, 35(2): 41-44.
[2]
ZHU Mingxing, PAN Yan, GAO Bo. Application of voltage regulator in photovoltaic poverty alleviation areas to enhance the power quality of low-voltage distribution networks[J]. Distributuon & Utilization, 2017(10): 19-25.
朱明星,潘岩,高博. 光伏扶贫地区调压器提升低压配电网电能质量的应用研究[J]. 供用电2017(10): 19-25.
[3]
DUFO-LÓPEZ R, JOSÉ L, AGUSTÍN B, et al. Multi-objective optimization minimizing cost and life cycle emissions of stand-alone PV-wind-diesel systems with batteries storage[J]. Applied Energy, 2011, 88(11): 4033-4041.
[4]
ABEDINI A, NIKKHAJOEI H. Dynamic model andcontrol of a wind-turbinegenerator with energystorage[J]. Renewable Power Generation, 2011, 5(1): 67-78.
[5]
DOU Xiaobo, YUAN Jian, WU Zaijun, et al. Improved configuration optimization of PV-wind-storage capacities for grid-connected microgrid[J]. Electric Power Automation Equipment, 2016, 36(3): 26-32.
窦晓波,袁简,吴在军,等. 并网型风光储微电网容量改进优化配置方法[J]. 电力自动化设备2016, 36(3): 26-32.
[6]
ZHENG Lingwei, LIU Shirong, ZHOU Wenjun, et al. Capacity configuration and optimization of grid-connected renewable energy power generation system[J]. Power System Protection and Control, 2014, 42(17): 31-37.
郑凌蔚,刘士荣,周文君,等. 并网型可再生能源发电系统容量配置与优化[J]. 电力系统保护与控制2014, 42(17): 31-37.
[7]
CHEN Zhong, HU Lülong, DING Nan. Optimized operation of wind-solar-battery hybrid power system based on improved entropy[J]. Power System Protection and Control, 2013, 41(21): 86-91.
陈中,胡吕龙,丁楠. 基于改进熵的风光储互补并网系统优化运行[J]. 电力系统保护与控制2013, 41(21): 86-91.
[8]
FANG Hengfu, SHENG Wanxing, WANG Jinli, et al. Research on the method for real-time online control of three-phase unbalanced load in distribution area[J]. Proceedings of the CSEE, 2015, 35(9): 2185-2193.
方恒福,盛万兴,王金丽,等. 配电台区三相负荷不平衡实时在线治理方法研究[J]. 中国电机工程学报2015, 35(9): 2185-2193.

Funding

Scientific and Technological Project of State Grid Corporation of China(52467K150007)
PDF(1467 KB)

Accesses

Citation

Detail

Sections
Recommended

/