Strategic Transformation Pathways of Power Generation Groups in the Context of New Power System Development during the 15th Five-Year Plan: A Review

ZHANG Haiyang1, ZHANG Xiaoliang1, QIU Guizhi2, YAN Qin1, WANG Jingfeng1, NI Guojian2

Distributed Energy ›› 0

PDF(816 KB)
PDF(816 KB)
Distributed Energy ›› 0 DOI: 10.16513/J.2096-2185.DE.26110579

Strategic Transformation Pathways of Power Generation Groups in the Context of New Power System Development during the 15th Five-Year Plan: A Review

  • ZHANG Haiyang1, ZHANG Xiaoliang1*,QIU Guizhi2,YAN Qin1,WANG Jingfeng1,NI Guojian2
Author information +
History +

Abstract

During the 15th Five-Year Plan period, China’s new power system is shifting from scale expansion to quality and efficiency improvement, and the traditional development model of power generation groups is facing systemic challenges. To clarify the development paths for power generation groups to adapt to the new power system, this paper takes the “15th Five-Year Plan for New Power System Construction” as the policy benchmark and adopts policy text analysis, domestic and international case benchmarking, and literature review. It examines the transformation requirements imposed by power system changes on power generation groups, summarizes common patterns in power transitions in the EU, the United States, and Japan, and compares typical practices of China's power generation groups. The findings show that power generation groups need to achieve three transitions: in development logic, from scale expansion to quality and efficiency; in system role, from power quantity mainstay to regulation support; and in industrial boundary, from single power generation to integrated energy. To address the above transformation requirements, this paper proposes five strategic pathways across five dimensions: clean energy expansion, system regulation support, industrial boundary expansion, existing asset upgrading, and digital capability foundation. This study can provide references for power generation groups’ 15th Five-Year Plan strategic planning and industrial policy making.

Key words

new power systems / 15th Five-Year Plan / power generation group transformation / source-grid-load-storage integration / multi-energy integration

Cite this article

Download Citations
ZHANG Haiyang1, ZHANG Xiaoliang1, QIU Guizhi2, YAN Qin1, WANG Jingfeng1, NI Guojian2. Strategic Transformation Pathways of Power Generation Groups in the Context of New Power System Development during the 15th Five-Year Plan: A Review[J]. Distributed Energy, 0 https://doi.org/10.16513/J.2096-2185.DE.26110579.

Funding

Key Science and Technology Project of China Datang Corporation Ltd. (No. DTKC-2026-10660).
PDF(816 KB)

Accesses

Citation

Detail

Sections
Recommended

/

〈 〉