Construction Demand Analysis of Chemical Energy Storage Power Station with Multi-Energy Complementary System

ZHANG Guihong , ZHANG Yujin , LIU Fei , FU Xu

Distributed Energy ›› 2021, Vol. 6 ›› Issue (4) : 70-76.

PDF(1268 KB)
PDF(1268 KB)
Distributed Energy ›› 2021, Vol. 6 ›› Issue (4) : 70-76. DOI: 10.16513/j.2096-2185.DE.2106526
Integrated Control Technology for Hydrogen and Renewable Energy Systems

Construction Demand Analysis of Chemical Energy Storage Power Station with Multi-Energy Complementary System

Author information +
History +

Abstract

Energy storage power station was needed in multi-energy complementary system with a high proportion of new energy generation for adoption of new energy power electricity. Taking an actual power grid as the example, the 8 760 h production simulation based on mathematical optimization was used to calculate the 8 760 h operating status of multi-energy complementary system, and a cost-benefit model of energy storage power was established to calculate capacity efficiency, power efficiency and energy storage duration of the energy storage station.On this basis, the reasonable scale of energy storage power station was analyzed comprehensively considering the constraints of new energy curtailment rate, power supply reliability.The research results can provide references for energy storage requirements and optimization of multi-energy complementary systems

Key words

energy storage power station / photovoltaic / capacity benefit / new energy abandon ratio / national economic evaluation

Cite this article

Download Citations
Guihong ZHANG , Yujin ZHANG , Fei LIU , et al. Construction Demand Analysis of Chemical Energy Storage Power Station with Multi-Energy Complementary System[J]. Distributed Energy Resources. 2021, 6(4): 70-76 https://doi.org/10.16513/j.2096-2185.DE.2106526

References

[1]
夏屹,王继伟. 多能互补综合能源未来发展方向的探讨[J]. 电工技术2021(5): 1-2.
XIA Yi, WANG Jiwei. Discussion on the future development direction of multi-energy complementary comprehensive energy[J]. Electric Engineering, 2021(5): 1-2.
[2]
陈启鑫,康重庆,夏清. 碳捕集电厂的运行机制研究与调峰效益分析[J]. 中国电机工程学报2010, 30(7): 22-28.
CHEN Qixin KANG Chongqing XIA Qing. Operation mechanism and peak-load shaving effects of carbon-capture power plant[J]. Proceeding of the CSEE, 2010, 30(7): 22-28.
[3]
方陈,张宇,廖望,等. 区域能源互联网多能协同优化中的储能效益评估[J]. 电力建设2021, 42(5): 48-56.
FANG Chen, ZHANG Yu, LIAO Wang, et al. Benefit evaluation of energy storage in multi-energy collaborative optimization of regional Energy Internet[J]. Electric Power Construction, 2021, 42(5): 48-56.
[4]
张宁,周天睿,段长刚,等. 大规模风电场接入对电力系统调峰的影响[J]. 电网技术2010, 34(1): 152-158.
ZHANG Ning, Zhou Tianrui, DUAN Changgang, et al. Impact of large-scale wind farm connecting with power grid on peak load regulation demand[J]. Power System Technology, 2010, 34(1): 152-158.
[5]
孙元章,吴俊,李国杰,等. 基于风速预测和随机规划的含风电场电力系统动态经济调度[J]. 中国电机工程学报2009, 29(4): 41-47.
SUN Yuanzhang, WU Jun, LI Guojie, et al. Dynamic economic dispatch considering wind power penetration based on wind speed forecasting and stochastic programming[J]. Proceeding of the CSEE, 2009, 29(4): 41-47.
[6]
刘斌,张玉琼,麻林巍,等. 西北地区源端基地综合能源系统的技术方案设计及优化研究[J]. 中国电机工程学报2021, 41(2): 568-580.
LIU Bin, ZHANG Yuqiong, MA Linwei, et al. Design and optimization of technical schemes of supply-side base integrated energy systems in Northwest China[J]. Proceeding of the CSEE, 2021, 41(2): 568-580.
[7]
杨冬锋,周苏荃,鲍锋. 风电并网系统低谷时段的调峰能力分析[J]. 电网技术2014, 38(6): 1446-1451.
YANG Dongfeng, ZHOU Suquan, BAO Feng. Analysis on peak load regulation capability of power grid integrated with wind farms in valley load period[J]. Power System Technology, 2014, 38(6): 1446-1451.
[8]
金虹,衣进. 当前储能市场和储能经济性分析[J]. 储能科学与技术2012, 1(2): 103-111.
JIN Hong, YI Jin. Analysis of the current energy storage market and energy storage economy[J]. Energy Storage Science and Technology, 2012, 1(2): 103-111.
[9]
杨裕生,程杰,曹高萍. 规模储能装置经济效益的判据[J]. 电池2011, 41(1): 19-21.
YANG Yusheng, CHENG Jie, CAO Gaoping. A gauge for direct economic benefits of energy storage devices[J]. Battery, 2011, 41(1): 19-21.
[10]
张伟波,谢玉荣,杨帆,等. 多能互补分布式综合供能系统及典型开发方案研究[J]. 发电技术2020, 41(3): 245-251.
ZHANG Weibo, XIE Yurong, YANG Fan, et al. Research on multi-energy complementary distributed integrated energy supply system and typical development scheme[J]. Power Generation Technology, 2020, 41(3): 245-251.
[11]
梁君君. 含光伏并网发电的储能容量配置方法[J]. 广东电力2017, 30(10): 52-56.
LIANG Junjun. Configuration method for storage energy capacity with grid-connected photovoltaic power generation[J]. Guangdong Electric Power, 2017, 30(10): 52-56.
[12]
李铁,李正文,杨俊友,等. 计及调峰主动性的风光水火储多能系统互补协调优化调度[J]. 电网技术2020, 44(10): 3622-3630.
LI Tie, LI Zhengwen, YANG Junyou, et al. Coordination and optimal scheduling of multi-energy complementary system considering peak regulation initiative[J]. Power System Technology, 2020, 44(10): 3622-3630.
[13]
郑乐,胡伟,陆秋瑜,等. 储能系统用于提高风电接入的规划和运行综合优化模型[J]. 中国电机工程学报2014, 34(16): 2533-2543.
ZHENG Le, HU Wei, LU Qiuyu, et al. Research on planning and operation model for energy storage system to optimize wind power integration[J]. Proceedings of the CSEE, 2014, 34(16): 2533-2543.
[14]
ZHANG N, LU X, MCELROY M B, et al. Reducing curtailment of wind electricity in China by employing electric boilers for heat and pumped hydro for energy storage[J]. Applied Energy, 2016, 184: 987-994.
[15]
陈兵,徐瑞,徐春雷,等. 规模化储能分区聚合有功调度控制技术研究[J]. 电力工程技术2021, 40(3): 35-41.
CHEN Bing, XU Rui, XU Chunlei, et al. Large-scale energy storage aggregation active power dispatching and control in subarea division of power grid[J]. Electric Power Engineering Technology, 2021, 40(3): 35-41.
[16]
傅旭,严欢,李富春,等. 储能电站对电网购电特性的影响研究[J]. 电力工程技术2020, 39(6): 98-103.
FU Xu, YAN Huan, LI Fuchun, et al. Influence of energy storage power station on the power purchase characteristics of power grid[J]. Electric Power Engineering Technology, 2020, 39(6): 98-103.
[17]
孙诚斌,李兆伟,李碧君,等. 电化学储能参与电网低频第三道防线的控制策略[J]. 电力工程技术2021, 40(3): 27-34.
SUN Chengbin, LI Zhaowei, LI Bijun, et al. A control strategy for the low frequency third defense line of power grid containing the electrochemical energy storage[J]. Electric Power Engineering Technology, 2021, 40(3): 27-34.
[18]
宋天昊,李柯江,韩肖清,等. 储能系统参与多应用场景的协同运行策略[J/OL]. 电力系统自动化:1-11[2021-07-12].
SONG Tianhao, LI Kejiang, HAN Xiaoqing, et al. Coordinated operation strategy of energy storage system participating in multiple application scenarios[J/OL]. Automation of Electric Power Systems: 1-11[2021-07-12].
[19]
傅旭,李富春,刘飞,等. 高比例新能源系统储能需求优化研究[J]. 电力需求侧管理2020, 22(6): 26-32.
FU Xu, LI Fuchun, LIU Fei, et al. Research on energy storage demand optimization of high proportion new energy system[J]. Power Demand Side Management, 2020, 22(6): 26-32.
PDF(1268 KB)

Accesses

Citation

Detail

Sections
Recommended

/