Research Progress on Risk Management of Photovoltaic Power Generation Construction Projects

ZHANG Lilin,LIU Yin,DONG Suiju,LYU Mingxu

Distributed Energy ›› 2022, Vol. 7 ›› Issue (4) : 56-63.

PDF(1109 KB)
PDF(1109 KB)
Distributed Energy ›› 2022, Vol. 7 ›› Issue (4) : 56-63. DOI: 10.16513/j.2096-2185.DE.2207408
Application Technology

Research Progress on Risk Management of Photovoltaic Power Generation Construction Projects

Author information +
History +

HeighLight

As the most promising power generation technology, photovoltaic power generation technology is developing rapidly all over the world. This paper analyzes the changing trend of the world energy structure, summarizes the development status of China's photovoltaic power generation industry, discusses the necessity of carrying out the research on the risk management of photovoltaic power generation projects, summarizes the focus and main achievements of the theoretical research on project risk management at home and abroad, and analyzes the research status of the risk management of photovoltaic power generation projects. The results suggest that the world energy structure is transforming from traditional energy such as oil and coal to new energy. China's photovoltaic power generation industry has achieved rapid development, but it does not pay enough attention to the risk management of photovoltaic power generation construction projects. Foreign scholars' research on project risk management mainly focuses on risk management identification, risk analysis model construction, project risk response and control, and there is a certain gap between domestic and foreign related research. Engineering procurement construction management (EPCM) mode is more suitable for the management of photovoltaic power generation construction projects, and it is necessary to carry out in-depth project risk research around the photovoltaic power generation construction projects under EPCM mode.

Cite this article

Download Citations
Lilin ZHANG , Yin LIU , Suiju DONG , et al. Research Progress on Risk Management of Photovoltaic Power Generation Construction Projects[J]. Distributed Energy Resources. 2022, 7(4): 56-63 https://doi.org/10.16513/j.2096-2185.DE.2207408

References

[1]
LI Y, CHIU Y H, LIN T Y, et al. Research on new and traditional energy sources in OECD countries[J]. International Journal of Environmental Research & Public Health, 2019(16): 1122.
[2]
建国雅文. 基于双面组件的可调支架光伏发电系统仿真研究[J]. 新能源进展2020, 8(5): 356-365.
CHEN Jianguo, ZHU Yawen, HONG Ling. Research on adjustable bracket in bifacial photovoltaic system[J]. Advances in New and Renewable Energy, 2020, 8(5): 356-365.
[3]
矗垚. BIPV/T技术在新徽派民居中的应用探索[J]. 新能源进展2021, 9(4): 300-310.
WANG Jun, WANG Chuyao, JI Jie. Investigation on the application of BIPV/T technology in new hui-style residential buildings[J]. Advances in New and Renewable Energy, 2021, 9(4): 300-310.
[4]
BP. BP世界能源统计年鉴[R/OL]. (2021-07)[2022-03-02].
[5]
YANG H C, CHEN Z, XIE Y, et al. Chinese Ink: A powerful photothermal material for solar steam generation[J]. Advanced Materials Interfaces, 2019(6): 1801252.
[6]
RANJBARAN P, YOUSEFI H, GHAREHPETIAN G B, et al. A review on floating photovoltaic (FPV) power generation units[J]. Renewable and Sustainable Energy Reviews, 2019(110): 332-347.
[7]
保虎凌宇智鹏. 荒漠戈壁集中式大型光伏并网电站建设工法[J]. 黑龙江水利科技2017, 45(2): 113-119.
[8]
勇健. 跨省区电力市场如何破局建功[J]. 中国电力企业管理2020(7): 28-30.
[9]
瑞华. 国外风险管理研究的理论、方法及其进展[J]. 外国经济与管理2005, 27(2): 25-31.
[10]
. 国外风险管理理论研究综述[J]. 金融发展研究2011(2): 23-27.
[11]
红卫. 建设项目风险管理问题研究:美国经验及其启示[J]. 技术经济与管理研究2008(5): 49-52.
WANG Hongwei. Construction project risk management research: The US experiences and the enlightenment[J]. Technoeconomics & Management Research, 2008(5): 49-52.
[12]
MURIANA C, VIZZINI G. Project risk management: A deterministic quantitative technique for assessment and mitigation[J]. International Journal of Project Management, 2017, 35(3): 320-340.
[13]
翔艺. 工程项目风险管理综述[J]. 口腔护理用品工业2022, 32(1): 19-20.
[14]
JAAFARI A. Management of risks, uncertainties and opportunities on projects: Time for a fundamental shift[J]. International Journal of Project Management, 2001, 19(2): 89-101.
[15]
AZAD K. Insurance of EPC projects[J]. Journal of the Insurance Institute of India, 2014(2): 135-138.
[16]
WOOSIK J, SEUNG H H, HEEDAE P. A stage-gate integrated risk control system for LNG plant projects: Focusing on the design phase[J]. Journal of Natural Gas Science & Engineering, 2015, 22: 437-446.
[17]
AHMAD S, OSAMA M. Risk identification and assessment for engineering procurement construction management projects using fuzzy set theory[J]. Canadian Journal of Civil Engineering, 2016, 43(5): 429-442.
[18]
SERPELL A, FERRADA X, RUBIO N L. Fostering the effective usage of risk management in construction[J]. Journal of Civil Engineering and Management, 2017, 23(7): 858-867.
[19]
ANTONIO R, FRANCISCO O, RAMIRO C. An intuitionistic method for the selection of a risk management approach to information technology projects-science direct[J]. Information Sciences, 2017, 375: 202-218.
[20]
JUNSEOK S, SUNGJOO L, BYUNGUN Y. Identification and prioritisation of risk factors in R&D projects based on an R&D process model[J]. Sustainability, 2018, 10(4): 972-990.
[21]
JOHNSTON J, SOILEAU J. Enterprise risk management and accruals estimation error[J]. Journal of Contemporary Accounting and Economics, 2020, 16(3): 100209.
[22]
KUDSZUS R, KLEMENCIC R, SPYRIDIS P. Basic concepts of engineering risk management for fastenings and risk register based on industry survey[J]. Civil Engineering, 2020(1): 275-290.
[23]
ACEBES F, PAJARES J, GONZÁLEZ-VARONA J M, et al. Project risk management from the bottom-up: Activity risk index[J]. Central European Journal of Operations Research, 2021, 29(4): 1375-1396.
[24]
HU J R, ZHOU E Y. Engineering risk management planning in energy performance contracting in China[J]. Systems Engineering Procedia, 2011, 1: 195-205.
[25]
旭东. 基于复杂性分析的大型工程项目主体行为风险管理研究[J]. 技术经济与管理研究2018(2): 37-41.
HE Xudong. Study on mega-projects subject behavior risk management based on complexity analysis[J]. Technoeconomics & Management Research, 2018(2): 37-41.
[26]
素英永立. 基于FAHP模型的铁路工程项目风险评估研究[J]. 铁道工程学报2019, 36(7): 92-99.
LI Suying, TIAN YA, WU Yongli. Research on the risk assessment of railway engineering project based on FAHP model[J]. Journal of Railway Engineering Society, 2019, 36(7): 92-99.
[27]
惠玲勇霖. EPC模式下总承包项目风险管理研究[J]. 建筑经济2020, 41(): 103-107.
Abstract
S1
LI Huiling, MOU Yonglin. Research on risk management of EPC project[J]. Construction Economy, 2020, 41(): 103-107.
S1
[28]
绍牧长青,等. 中国石油陆上首个高含硫气田国际合作项目开发理念及管理模式[J]. 天然气工业2021, 41(10): 58-68.
WEN Shaomu, JIA Changqing, LI Hong, et al. Development concept and management model of petro China's first international cooperation project of onshore high-sulfur gas fields[J]. Natural Gas Industry, 2021, 41(10): 58-68.
[29]
礼彪璐瑶怡晨,等. 公路工程项目组合施工进度风险防范策略[J]. 中国公路学报2021, 34(9): 203-214.
[30]
. 浅析项目风险管理方法及在海洋石油工程项目中的应用[J]. 中国石油和化工标准与质量2022, 42(8): 93-95.
[31]
正安. 产品分成模式下的矿业项目风险管理探讨[J]. 财务与会计2018(13): 8-9.
[32]
OKURA M. Solar power generation and risk transfer systems[J]. International Journal of Business, 2015, 20(4): 347-356.
[33]
KIROVA M, VELIKOVA P. Risk management method for small photovoltaic plants[J]. Management & Marketing, 2016(11): 498-512
[34]
GUERIN T F. Evaluating expected and comparing with observed risks on a large-scale solar photovoltaic construction project: A case for reducing the regulatory burden[J]. Renewable and Sustainable Energy Reviews, 2017, 74: 333-348.
[35]
LUIS S G, IGNACIO M H J. Risk influence analysis assessing the profitability of large photovoltaic plant construction projects[J]. Sustainability, 2020, 12(21): 9127-9143.
[36]
旭辉晓伟. 分布式光伏EPC项目风险管理研究与应用[J]. 项目管理技术2016, 14(2): 108-113.
[37]
小兵. BT模式下的大型光伏发电项目风险评价研究[J]. 科技管理研究2017, 37(21): 45-48.
DONG Bo, YANG Xiaobing. Research on the risk assessment of BT large photovoltaic project[J]. Science and Technology Management Research, 2017, 37(21): 45-48.
[38]
凤娜. 光伏发电项目的投资风险分析及控制策略研究[J]. 现代经济信息2018(14): 387.
[39]
智慧. 光伏项目投资风险控制研究——以越南头顿光伏项目为例[J]. 华北电力大学学报(社会科学版), 2019, 122(6): 47-58.
LIAO Yong, XIE Zhihui. Research on risk control of photovoltaic project investment—Taking the touton photovoltaic project in Vietnam as an example[J]. Journal of North China Electric Power University (Social Sciences), 2019, 122(6): 47-58.
[40]
建华,等. 基于模糊综合法的光伏发电项目风险评价方法及其应用研究[J]. 常州大学学报(自然科学版), 2019, 31(3): 63-70.
YANG Yan, ZHA Jianhua, ZHOU Yi, et al. Risk evaluation method of photovoltaic power generation project and its application research based on fuzzy synthesis[J]. Journal of Chang Zhou University (Natural Science Edition), 2019, 31(3): 63-70.
[41]
镇有继善. 关于工程总承包项目管理模式的选择及对项目高效运营的影响研究[J]. 科技进步与对策2010, 27(19): 5-7.
[42]
燕萍. 分布式光伏项目管理中的EPC模式应用分析[J]. 自动化应用2021(8): 107-109.
[43]
WU Y N, ZHOU J L. Risk assessment of urban rooftop distributed PV in energy performance contracting (EPC) projects: An extended HFLTS-DEMATEL fuzzy synthetic evaluation analysis[J]. Sustainable Cities and Society, 2019, 47: 101524.
[44]
承鸣. EPCM项目管理及应对措施思考[J]. 工程建设与设计2019(16): 215-216.
HU Chengming. Consideration on EPCM project management and responding measures[J]. Construction & Design for Project, 2019(16): 215-216.
[45]
嘉奇. 海外柔性直流输电工程项目质量管理体系及成熟度评价[J]. 发电技术2020, 41(4): 361-368.
CUI Jiaqi. Quality management system and maturity evaluation of overseas flexible HVDC transmission project[J]. Power Generation Technology, 2020, 41(4): 361-368.

Funding

Project supported by Henan Housing and Urban Rural Construction Science and Technology Plan(K-2145)
Zhengzhou Construction Science and Technology Project(202211)
PDF(1109 KB)

Accesses

Citation

Detail

Sections
Recommended

/